Contact Information
 |
|
Office Phone
(714) 894-3300
Address
5842 Mcfadden Ave, Unit M
Huntington Beach, CA 92649
|
|
|
|
|
|
References
 |
Project: Puerto Vallarta Boat Show
Date: March 12-15 2009
Location: Puerto Vallarta
Materials used: Temporary Docks with Helix and Seaflex Mooring System
Contact info: Michael Rawlings
Description of Project: USMS has been contracted by Brunswick Latin American Group and U.S. Marine, the largest boat builder in the world, for the installation of a temporary marina in Puerto Vallarta, Mexico. USMS will be mobilizing the required docks and mooring system all the way from the U.S. to be used as a temporary marina to moor the boats for the show. The show will feature all the latest in designs in small runabouts to the larger yachts found cruising all over the world. “We look forward to the opportunity to work with U.S. Marine in the creation of this innagural event, it will showcase our ability to design, implement and produce a sizeable Boat Show anywhere in the world” Michael Rawlings President of U.S. Mooring Systems, Inc.
|
|
|
|
|
|
|