Contact Information
Office Phone
(714) 894-3300

Address
5842 Mcfadden Ave, Unit M
Huntington Beach, CA 92649
   References
Project: Boy Scouts of America, Dock installation

Date: 4/08-5/08

Location: Emerald Bay Catalina Island, California

Materials used: Helix Anchors, Seaflex

Contact info: Michael Rawlings

Description of Project: Install 6 Helix anchors in conjunction with 8 - 8030GCBP Seaflex units.

Video/Pictures: These pictures and video were taken during a recent storm. As you can see in the video and the pictures, Seaflex and Helix can withstand most of what mother nature can throw, if the system is designed and installed correctly. During this storm, no damage was sustained to either the boats or docks anchored by the Seaflex/Helix System.

© All rights reserved. U.S. Mooring System Inc. 2009. Webmaster