Contact Information
 |
|
Office Phone
(714) 894-3300
Address
5842 Mcfadden Ave, Unit M
Huntington Beach, CA 92649
|
|
|
|
|
|
References
 |
Project: Sacramento Dock and Roofing installation
Date: 10/07-08/08
Location: Sacramento, CA
Materials used: Concrete docks provided by Bellingham Marine, Roofing designed and provided by both Bellingham Marine and McElroy Metals.
Contact info: Michael Rawlings
Description of Project: Install a 800 slip marina including the Potable water system. Install the steel roofing system.
|
|
|
|
|
|
|