Contact Information
Office Phone
(714) 894-3300

Address
5842 Mcfadden Ave, Unit M
Huntington Beach, CA 92649
   References
Project: Sacramento Dock and Roofing installation

Date: 10/07-08/08

Location: Sacramento, CA

Materials used: Concrete docks provided by Bellingham Marine, Roofing designed and provided by both Bellingham Marine and McElroy Metals.

Contact info: Michael Rawlings

Description of Project: Install a 800 slip marina including the Potable water system. Install the steel roofing system.






Go back
© All rights reserved. U.S. Mooring System Inc. 2009. Webmaster